Contact Us Phone: (09) 837 5195 | 0800 432 100 | Email: sales@aquatechnics.co.nz
When you choose Aqua Technics, not only do you get a superior swimming pool but also an install team that are amongst the most experienced and knowledgeable in the industry. This ensures that each installation is carried out with the upmost precision and usually only takes 1 to 2 days (including excavation).
A standard pool installation looks like this…
Step 1: The digger levels the pool site and completes any ground preparation before the pool is marked out and the hole is excavated. Levels are checked using a laser level throughout to confirm they are within specification.
Step 2: Once the pool has been excavated to the required depth, a layer of bedding material is placed in the hole and it is levelled off to the precise height to ensure the pool sits flat.
Step 3: The pool hole is inspected by the Council and in most cases a Geotechnical Engineer before the digger (or crane) carefully lifts the pool into the hole and final checks are made to ensure the pool is perfectly level.
Step 4: Once the pool is in position, we backfill around the pool with scoria and cement, fill it with water and connect the filtration equipment.
Step 5: Temporary fencing needs to be erected in accordance with the Fencing of Swimming Pools Act 1987 and then it’s time to call in the landscapers and an electrician.
Step 6: The landscaping is completed and a handover conducted where we show you how everything works and how to care for your pool. Now the pool is yours to enjoy!
TOP